|
|
Our Water Program (NPDES II)
|
Design Information
Design Parameters: Design Parameters: Revised November 1, 2006
Permit: Whenever any work is to be done to a county drain a permit is required.
Stand Pipe Detail: Suggested detail for stand pipe.
Checklist for Public Storm: Before any storm can be dedicated to this office and made public, all the items on our Checklist for Public Storm must be complete. NOTE: there has been a change to the requirements for sites submitted for dedication effective May 1, 2006.
Contract Documents: Beginning June 1, 2006 the contract books will no longer include the General Conditions (90 kb) and our Standard Specifications (441 kb). Either can be printed here for free. For a $5.00 fee, written copies can be provided upon request.
Pond Permit: to review a individual pond for construction, a drawing with the following items is needed.
·
8½”
x 11” or
8½” x 14” paper drawing
|
|
You will need to download Adobe Acrobat Reader if it is not already installed on your system to read PDF files. Last updated: 12/03/2007 |